Carbon fibre, technical fabrics, and precision components across equipment, apparel, and footwear lines. FalOrb gives sporting goods manufacturers real-time visibility into advanced materials, product BOMs, seasonal production builds, and variant inventory.
Book a Demo →Seasonal product launches tied to sporting calendars - ski season, golf season, back-to-school. Advanced materials like carbon fibre and technical fabrics sourced from specialty suppliers with long lead times. Every product in multiple sizes, colours, and performance tiers. When the seasonal build starts, material shortages emerge for the one SKU your biggest retailer ordered most.
FalOrb was built for the seasonal intensity of sporting goods - where missing a sport season launch window means warehousing inventory until next year.
Real-Time Stock / Multi-Level BOM / Auto-Costing
MRP Horizons / Supplier Management / Alert System
FalOrb covers the full sporting goods lifecycle. Advanced material inventory, variant-aware BOM management, seasonal production scheduling, safety testing records, and finished goods tracking - all connected in one platform.
Every carbon layup is tracked. Every fabric bolt is recorded. Every variant is managed. From raw material receipt through moulding, assembly, finishing, and packaging to seasonally scheduled product dispatch.
Real screens. Real layout. Simulated data from a sporting goods manufacturing facility.
One screen to see every location, every critical item, every in-transit shipment. Health status propagates from stock to location to the organization level.
Full lifecycle tracking from draft to completion. Material status tells you instantly whether the line can run or needs procurement action.
| Order # | Product | Location | Qty Ordered | Qty Produced | Material | Status |
|---|---|---|---|---|---|---|
| PO-2026-4741 | Carbon Fiber Tennis Racket | Composite Fabrication Shop | 6,000 | 4,350 | Sufficient | In Progress |
| PO-2026-4742 | Alloy Bicycle Frame (M/L) | Assembly & Finishing Center | 3,200 | 0 | Partial | Confirmed |
| PO-2026-4743 | Kayak Hull (Rotomolded PE) | Composite Fabrication Shop | 1,500 | 1,500 | Sufficient | Completed |
| PO-2026-4744 | EVA Foam Yoga Mat (6mm) | Assembly & Finishing Center | 25,000 | 12,800 | Sufficient | In Progress |
| PO-2026-4745 | Graphite Golf Shaft Set | Composite Fabrication Shop | 8,000 | 0 | Critical | Draft |
Auto-generated, role-routed alerts with one-click acknowledge and resolve. The system detects, you act.
| Type | Item | Location | Message | Triggered | Status | |
|---|---|---|---|---|---|---|
| ▲ | Below Minimum | Carbon Fiber Pre-Preg (T700) | Composite Fabrication Shop | 30 min ago | Active | |
| ▼ | Supplier Delay | 6061-T6 Aluminum Tubing | Assembly & Finishing Center | 2 hr ago | Active | |
| ▼ | Demand Spike | EVA Foam Sheet (45 Shore A) | Raw Materials Warehouse | 4 hr ago | Monitoring | |
| ▼ | Quality Hold | Polyurethane Grip Tape | Assembly & Finishing Center | 6 hr ago | Pending Review | |
| ● | Reorder Triggered | LLDPE Resin (Rotomold) | Composite Fabrication Shop | 11 hr ago | Resolved |
When a critical material drops below threshold, FalOrb doesn't wait for someone to notice. The system detects, alerts, acts, and records - automatically.
Designed on the factory floor, not in a software lab. Every feature exists because a manufacturer needed it. Not because a product manager imagined it.- FalOrb, Product Philosophy
FalOrb is built for sporting goods manufacturers where season launches are non-negotiable, advanced material lead times require early commitment, and variant complexity multiplies every planning decision. If that's your operation, let us show you what connected sports production looks like.
Book a Demo →