Steel plate by the thousand tonnes, piping systems measured in kilometres, and outfitting schedules that span months. FalOrb gives shipbuilders real-time visibility into material stock, block-level BOMs, and construction milestones across every vessel under build.
Book a Demo →A single vessel contains hundreds of thousands of components across structural, mechanical, electrical, and outfitting systems. Steel plates nested and cut for specific blocks. Pipe spools fabricated off-site and delivered to sequence. When Block 42 is ready for outfitting but the pipe spools haven't arrived, the entire construction sequence backs up.
FalOrb was built for the programme scale of shipbuilding - where material delivery timing against block erection sequence determines whether a vessel launches on schedule.
Real-Time Stock / Multi-Level BOM / Auto-Costing
MRP Horizons / Supplier Management / Alert System
FalOrb covers the full shipbuilding lifecycle. Steel and material inventory, block-level BOM management, construction sequence planning, classification compliance, and multi-vessel scheduling - all connected in one platform.
Every steel plate is tracked. Every pipe spool is logged. Every classification certificate is linked. From raw material receipt through cutting, fabrication, block assembly, erection, and outfitting to launched and delivered vessels.
Real screens. Real layout. Simulated data from a shipbuilding facility.
One screen to see every location, every critical item, every in-transit shipment. Health status propagates from stock to location to the organization level.
Full lifecycle tracking from draft to completion. Material status tells you instantly whether the line can run or needs procurement action.
| Order # | Product | Location | Qty Ordered | Qty Produced | Material | Status |
|---|---|---|---|---|---|---|
| PO-2026-5501 | Hull Section Block 14A | Hull Construction Yard | 1 | 0 | Partial | In Progress |
| PO-2026-5502 | Marine Diesel Engine Mount | Propulsion Systems Center | 4 | 2 | Sufficient | In Progress |
| PO-2026-5503 | Bridge Console Assembly | Outfitting & Integration Bay | 2 | 2 | Sufficient | Completed |
| PO-2026-5504 | Ballast Water Treatment System | Marine Stores Warehouse | 3 | 0 | Critical | Confirmed |
| PO-2026-5505 | Stern Tube & Shaft Assembly | Hull Construction Yard | 6 | 0 | Sufficient | Draft |
Auto-generated, role-routed alerts with one-click acknowledge and resolve. The system detects, you act.
| Type | Item | Location | Message | Triggered | Status | |
|---|---|---|---|---|---|---|
| ▲ | Stock Out | AH36 Shipbuilding Steel Plate (25mm) | Hull Construction Yard | 25 min ago | Active | |
| ▲ | Below Safety Stock | Marine-Grade Welding Electrodes (7018MR) | Hull Construction Yard | 2 hrs ago | Active | |
| ▼ | MRP Shortfall | Copper-Nickel Piping (3" DN80) | Outfitting & Integration Bay | 4 hrs ago | Pending | |
| ▼ | Lead Time Breach | Controllable Pitch Propeller Blades | Propulsion Systems Center | 6 hrs ago | Pending | |
| ● | Transfer Complete | Marine Anti-Fouling Paint (IMO Compliant) | Marine Stores Warehouse | 10 hrs ago | Resolved |
When a critical material drops below threshold, FalOrb doesn't wait for someone to notice. The system detects, alerts, acts, and records - automatically.
Designed on the factory floor, not in a software lab. Every feature exists because a manufacturer needed it. Not because a product manager imagined it.- FalOrb, Product Philosophy
FalOrb is built for shipbuilders where block erection sequence drives everything, classification compliance is surveyed, and multi-vessel programmes compete for yard resources. If that's your yard, let us show you what connected shipbuilding production looks like.
Book a Demo →