ProblemPlatformModulesHow It WorksBook a Demo →
Inventory & Production Management for Building Materials

The control
tower for your
building materials
operation.

Bulk materials, multi-site distribution, and project-driven demand cycles. FalOrb gives building materials manufacturers real-time visibility into stock across every plant and depot, every BOM, and every production run.

Book a Demo →
Real-Time StockMulti-Level BOMATP EngineMRP PlanningMulti-Site TrackingSupplier ManagementTransfer EngineAudit LedgerReal-Time StockMulti-Level BOMATP EngineMRP PlanningMulti-Site TrackingSupplier ManagementTransfer EngineAudit Ledger
Building Materials and Construction Supplies operations
01 / The Problem - Yard & Plant
■ The Problem

Your plants and depots
run on
siloed data.

Bulk materials across multiple plants and depots with no unified view. Stock estimated by bay level. Project orders fulfilled from wherever has stock - discovered by phone call, not system query.

FalOrb was built for multi-site building materials operations - where project demand is lumpy, logistics are complex, and stock visibility across the network determines whether you deliver on time.

Pain 01
Multi-Site Stock Blindness
Stock scattered across plants, depots, and yards with no unified visibility. Fulfilment depends on phone calls and local knowledge. Transfers between sites happen informally with no audit trail.
Pain 02
Project Demand Unpredictability
Large project orders arrive with variable lead times. No forward demand planning. Production scheduled reactively. When a major project draws down stock, other commitments suffer silently.
Pain 03
Bulk Material Estimation
Aggregates, cement, timber, and other bulk materials estimated rather than precisely tracked. Inventory counts happen monthly at best. Discrepancies between actual and recorded stock grow undetected.
Pain 04
Transport & Logistics Gaps
Inter-site transfers and customer deliveries planned without live stock data. Trucks dispatched to collect material that isn't there. Delivery promises made on stale information.
Building Materials and Construction Supplies production

Inventory & Production

Real-Time Stock / Multi-Level BOM / Auto-Costing

Supply chain operations

Supply Chain & Operations

MRP Horizons / Supplier Management / Alert System

Building Materials and Construction Supplies platform
02 / The Platform - Built for Building Materials and Construction Supplies
■ The Platform

One system from
raw aggregate to
delivered product.

FalOrb covers the full building materials lifecycle. Multi-site inventory management, production order tracking, inter-depot transfers, and procurement planning - all connected with real-time stock visibility.

Every material movement is recorded across every site. Every transfer has chain of custody. Every discrepancy surfaces immediately. From raw material through production to customer delivery.

■ Platform in Action

See what your
building materials and construction supplies operations
look like inside FalOrb.

Real screens. Real layout. Simulated data from a building materials and construction supplies facility.

01 / Overview

Operations Dashboard

One screen to see every location, every critical item, every in-transit shipment. Health status propagates from stock to location to the organization level.

falorb.com/overview

Overview

Updated just now
Refresh
7
Total Locations
3
Critical Items
8
Pending Transfers
11
Active Alerts
13
Active Production Orders
2
Material Shortages
1
Products ATP Zero
4
MRP Shortfalls
Batching Plant
Production
Healthy
3 critical 12 low 96 healthy
Timber Mill
Production
Low
5 critical 16 low 118 healthy
Aggregate Yard
Warehouse
Healthy
4 low 42 healthy 8 surplus
Dispatch & Logistics Yard
Distribution
Critical
7 critical 20 low 74 healthy
02 / Production

Production Orders

Full lifecycle tracking from draft to completion. Material status tells you instantly whether the line can run or needs procurement action.

falorb.com/production-orders

Production Orders

+ New Order
All 13
Draft 2
Confirmed 3
In Progress 6
Completed 3
Order #ProductLocationQty OrderedQty ProducedMaterialStatus
PO-2026-9201Ready-Mix Concrete C30/37Batching Plant500380SufficientIn Progress
PO-2026-9202Structural Timber 90x45mm H1.2Timber Mill2,4002,400SufficientCompleted
PO-2026-9203Concrete Roof Tile Slate GreyBatching Plant18,0006,200PartialIn Progress
PO-2026-9204Fibre Cement Board 2400x1200Batching Plant4,0000CriticalConfirmed
PO-2026-9205Engineered LVL Beam 300mmTimber Mill6000SufficientDraft
03 / Alerts

13-Type Alert System

Auto-generated, role-routed alerts with one-click acknowledge and resolve. The system detects, you act.

falorb.com/alerts

Alerts

All 11
Active 8
Acknowledged 3
Resolved 1
TypeItemLocationMessageTriggeredStatus
Stock CriticalPortland Cement CEM I 42.5Batching PlantSilo at 8% capacity. 2 concrete pours scheduled tomorrow.2 min agoActive
PO OverdueCellulose Fibre ReinforcementBatching PlantSupplier delivery 5 days overdue. Fibre cement production halted.18 min agoActive
Stock LowRadiata Pine Logs Grade STimber Mill3 days milling supply remaining. Forest lot harvest delayed by weather.1 hr agoAcknowledged
Consumption AnomalyPlasticizer AdmixtureBatching PlantDosage 25% above mix design. Verify moisture content of aggregates.2 hrs agoAcknowledged
Stock Low20mm Crushed AggregateAggregate YardApproaching reorder level. Quarry delivery scheduled for Wednesday.5 hrs agoResolved
Module 01
Location Management
Every plant, warehouse, and zone mapped. Multi-site hierarchy with role-based access control across your entire operation.
Module 02
Item & BOM
Multi-level bill of materials with auto-costing. Component tracking from raw input to final assembly with full version control.
Module 03
Production Orders
Material reservation, real-time progress, and variance tracking across every production run. Full lifecycle visibility from creation to completion.
Module 04
ATP Engine
Available-to-promise. Know what you can make and when, before committing to delivery. Real-time calculation against live stock and reservations.
Module 05
Transfer Engine
Structured inter-location transfers. Request, approve, ship, receive - every step recorded in the ledger with full chain of custody.
Module 06
MRP & Procurement
Demand planning across 7, 14, 30, and 60-day horizons. Purchase order lifecycle and supplier management with automated recommendations.
Module 07
Alert System
13 alert types with auto-resolve capability. Role-routed by severity to ensure the signal reaches the person who can act - immediately.
Module 08
Audit Ledger
Immutable. Every movement, every adjustment, every transaction recorded permanently. Nothing is mutated directly. The single source of truth.
■ How It Works

From stockout
to signal in
under a second.

When a critical material drops below threshold, FalOrb doesn't wait for someone to notice. The system detects, alerts, acts, and records - automatically.

01
Detect
Stock health reclassified in real-time. Four-state system flags the risk level before it becomes a problem.
02
Alert
The right role receives the alert. 13 alert types ensure the signal reaches the person who can act.
03
Act
Transfer request routed. MRP recommendation generated. Production order adjusted. Structured workflow, not ad hoc chat.
04
Record
Every action logged to the immutable audit ledger. Full traceability from detection to resolution.
Designed on the factory floor, not in a software lab. Every feature exists because a manufacturer needed it. Not because a product manager imagined it.
- FalOrb, Product Philosophy
8
Core Platform Modules
13
Alert Types / Auto-Resolve
60d
MRP Planning Horizon
4
Stock Health States

Your network
deserves one system.

FalOrb is built for building materials manufacturers where multi-site visibility determines delivery performance and stock estimation is costing you margin. If that's your operation, let us show you what connected inventory looks like.

Book a Demo →
© 2026 FalOrb. All rights reserved.
Back to top ↑