Code-stamped steel, certified welding consumables, and ASME compliance across boiler, tank, and container product lines. FalOrb gives vessel manufacturers real-time visibility into steel plate inventory, fabrication BOMs, weld maps, and code compliance documentation.
Book a Demo →Steel plate ordered to ASME specifications with mandatory mill test reports. Every weld documented by welder qualification, procedure, and consumable lot. Pressure testing requires complete material and weld traceability before the inspector arrives. When an authorised inspector finds a traceability gap, the vessel sits until records are reconstructed.
FalOrb was built for the code compliance demands of pressure vessel fabrication - where incomplete weld documentation holds up a finished vessel from shipping.
Real-Time Stock / Multi-Level BOM / Auto-Costing
MRP Horizons / Supplier Management / Alert System
FalOrb covers the full vessel and container lifecycle. Code-grade material inventory, fabrication BOM management, weld map tracking, inspection scheduling, and compliance documentation - all connected with full material-to-weld traceability.
Every plate is certified. Every weld is mapped. Every inspection is documented. From raw material receipt through cutting, rolling, welding, and testing to code-stamped and delivered vessels.
Real screens. Real layout. Simulated data from a boilers, tanks, and shipping container manufacturing facility.
One screen to see every location, every critical item, every in-transit shipment. Health status propagates from stock to location to the organization level.
Full lifecycle tracking from draft to completion. Material status tells you instantly whether the line can run or needs procurement action.
| Order # | Product | Location | Qty Ordered | Qty Produced | Material | Status |
|---|---|---|---|---|---|---|
| PO-2026-6601 | Fire-Tube Industrial Boiler | Pressure Vessel Fabrication | 8 | 5 | Sufficient | In Progress |
| PO-2026-6602 | 20ft ISO Shipping Container | Container Assembly Line | 250 | 250 | Sufficient | Completed |
| PO-2026-6603 | ASME Horizontal Storage Tank | Pressure Vessel Fabrication | 12 | 4 | Partial | In Progress |
| PO-2026-6604 | Cryogenic LNG Tank Module | Raw Materials Yard | 3 | 0 | Critical | Confirmed |
| PO-2026-6605 | Heat Recovery Steam Generator | Pressure Vessel Fabrication | 2 | 0 | Sufficient | Draft |
Auto-generated, role-routed alerts with one-click acknowledge and resolve. The system detects, you act.
| Type | Item | Location | Message | Triggered | Status | |
|---|---|---|---|---|---|---|
| ▲ | Stock Out | SA-516 Grade 70 Pressure Plate | Raw Materials Yard | 18 min ago | Active | |
| ▲ | Below Safety Stock | Corten Steel Sheet (SPA-H) | Container Assembly Line | 2 hrs ago | Active | |
| ▼ | Lead Time Breach | 9% Nickel Steel Plate (ASTM A553) | Pressure Vessel Fabrication | 4 hrs ago | Pending | |
| ▼ | MRP Shortfall | Pressure Relief Valves (ASME Certified) | Pressure Vessel Fabrication | 6 hrs ago | Pending | |
| ● | Transfer Complete | Container Corner Castings (ISO 1161) | Container Assembly Line | 11 hrs ago | Resolved |
When a critical material drops below threshold, FalOrb doesn't wait for someone to notice. The system detects, alerts, acts, and records - automatically.
Designed on the factory floor, not in a software lab. Every feature exists because a manufacturer needed it. Not because a product manager imagined it.- FalOrb, Product Philosophy
FalOrb is built for pressure vessel manufacturers where ASME code compliance is the baseline, weld traceability is mandatory, and authorised inspector hold points determine your delivery schedule. If that's your shop, let us show you what connected vessel fabrication looks like.
Book a Demo →