Hydraulic systems, heavy steel fabrications, and powertrain assemblies across tractors, excavators, and mining equipment. FalOrb gives heavy machinery manufacturers real-time visibility into high-value components, deep BOMs, and long-cycle production orders.
Book a Demo →Hydraulic pumps with 20-week lead times. Castings from foundries that batch-produce quarterly. Engines sourced from OEM partners on allocation. A single machine can have 3,000 components across five BOM levels. When a dealer places an urgent order, confirming build feasibility means checking procurement status across dozens of long-lead items.
FalOrb was built for the scale and lead-time complexity of heavy machinery - where a delayed hydraulic valve pushes the entire machine delivery by months.
Real-Time Stock / Multi-Level BOM / Auto-Costing
MRP Horizons / Supplier Management / Alert System
FalOrb covers the full heavy machinery lifecycle. High-value component tracking, deep BOM management, long-cycle production orders, procurement planning, and aftermarket parts visibility - all connected in one platform.
Every casting is tracked. Every hydraulic assembly is logged. Every production milestone is recorded. From raw material receipt through fabrication, sub-assembly, final assembly, and testing to delivered and commissioned machinery.
Real screens. Real layout. Simulated data from a agriculture, construction, and mining machinery manufacturing facility.
One screen to see every location, every critical item, every in-transit shipment. Health status propagates from stock to location to the organization level.
Full lifecycle tracking from draft to completion. Material status tells you instantly whether the line can run or needs procurement action.
| Order # | Product | Location | Qty Ordered | Qty Produced | Material | Status |
|---|---|---|---|---|---|---|
| PO-2026-4711 | Compact Track Loader CTL-320 | Heavy Equipment Assembly Plant | 85 | 52 | Partial | In Progress |
| PO-2026-4712 | Excavator Hydraulic Boom Arm | Hydraulics & Drivetrain Facility | 240 | 240 | Sufficient | Completed |
| PO-2026-4713 | Agricultural Grain Harvester GH-9500 | Heavy Equipment Assembly Plant | 40 | 12 | Critical | In Progress |
| PO-2026-4714 | Mining Dump Truck Chassis Frame | Structural Steel Parts Warehouse | 60 | 0 | Sufficient | Confirmed |
| PO-2026-4715 | Backhoe Loader Transmission Assembly | Hydraulics & Drivetrain Facility | 150 | 0 | Partial | Draft |
Auto-generated, role-routed alerts with one-click acknowledge and resolve. The system detects, you act.
| Type | Item | Location | Message | Triggered | Status | |
|---|---|---|---|---|---|---|
| ▲ | Stock Out | Hydraulic Cylinders (200mm Bore) | Hydraulics & Drivetrain Facility | 8 min ago | Active | |
| ▲ | Below Minimum | High-Tensile Steel Plate (25mm) | Structural Steel Parts Warehouse | 45 min ago | Active | |
| ▼ | MRP Shortfall | Planetary Gear Sets (ZF Series) | Heavy Equipment Assembly Plant | 1 hr ago | Acknowledged | |
| ▼ | Supplier Delay | Diesel Engine Block (Tier 4 Final) | Heavy Equipment Assembly Plant | 3 hr ago | Acknowledged | |
| ● | Transfer Complete | Track Chain Assemblies (600mm) | Regional Distribution Hub | 4 hr ago | Resolved |
When a critical material drops below threshold, FalOrb doesn't wait for someone to notice. The system detects, alerts, acts, and records - automatically.
Designed on the factory floor, not in a software lab. Every feature exists because a manufacturer needed it. Not because a product manager imagined it.- FalOrb, Product Philosophy
FalOrb is built for heavy machinery manufacturers where lead times are measured in months, BOMs run thousands of components deep, and aftermarket parts commitments span decades. If that's your operation, let us show you what connected heavy manufacturing looks like.
Book a Demo →